Michael departed, and I went to the site to
meet with serge in order to finish the digging. I was happy to find out that
the digging is not manually, but will be done with a digger. This way The digging is much more efficient
and takes little time.
The digger lifts up the soil and pours it close to the installation
in order to cover the basis of the installation. However, in order to build the
tunnel close to the installation , we use a shovel.
On my request, we started
to cover up part of the ground with the top layer we have kept aside, while
digging. However, it doesn't seem to be sufficient, so I start collecting a few
dry herbs and place them on the top of the brown soil. Serge calms me down by
saying that considering the high humidity, the soil will be covered in green
within a week.
We finish the work
in two hours. The installation is ready. I was having a hard time comprehending
this work has come to an end. Meanwhile I stay there and tried to capture it on
camera.
No comments:
Post a Comment